The Change Order Minimal, in detail.
Real content in every part, ready to rewrite with your own.
- 101, Project and parties: the title and how changes are signed, then the project and contract number, the change order no. and date, the owner and the architect
- 202, Scope of change: the description, the reason, drawing and specification references, who requested it, the RFI or bulletin number, and the pricing basis (lump sum, unit prices, or time and materials)
- 303, Cost: labor, materials, subcontractors, equipment, general conditions, overhead and profit, bond and insurance, and the total, with the contractor’s quote attached
- 404, Contract time: whether it adds or saves time, the working days, the new substantial completion date, why, and the updated schedule
- 505, Sign-off: the original contract sum, earlier changes, this change and the new sum and time set out like a title block, with the contractor’s and architect’s signatures, then the owner’s decision, comments (when approving with comments or rejecting), signature and date
- 6Thank you: what happens once all three parties have signed and who to call, beside a white card-model axonometric of the fit-out on black
Change Order Minimal is a five-step form for general contractors and design-build firms on commercial work, where the owner, contractor and architect all sign each change. It names the project, change number, owner and architect, then sets out the scope with drawing and specification references, who asked for it, the RFI or bulletin and the pricing basis. The cost step breaks the price into labor, materials, subcontractors, equipment, general conditions, overhead and profit and bond and insurance with the quote attached, then the contract time moves in working days. The sign-off shows the contract sum like a title block before the owner signs. Ink on stone, Instrument Sans and numbered questions keep it precise.
Made for
- Finance and accounts teams
- Operations managers
- In-house marketing and design teams
- Founders running their own back office
Open it in Forms and work through it in four steps, or let Docsiv AI do the first pass with your details.
- Step 1
Swap in your firm’s name and wordmark, and list your live contracts in the project dropdown.
- Step 2
Match the cost lines and the overhead and profit rate to your contract’s change order clause.
- Step 3
For each change, update the title block with the original sum, prior changes, this change and the new completion date.
- Step 4
Send the link to the owner once the contractor and architect have signed, and file the executed change with the contract.
Is the Change Order Minimal template free?
Yes. Create a free account and it opens in Docsiv's Forms app, ready to edit and share. The Free plan includes every Docsiv app and 500 AI credits a month.
Can I change the colors, fonts and text?
Yes, all of it. The template uses Instrument Sans with #f3f2ee, #131313, #141414, and you can change any of them, rewrite every word and add or remove questions.
What can I export it as?
Forms in Docsiv offers: Responses exported as CSV. Once it's saved, you can also share it with a link.
Can Docsiv AI write the construction change order for me?
Yes. Tell Docsiv AI about the client or project and it can draft the content in this template's style, which you then review and edit. AI uses credits; the Free plan includes 500 a month.
Where do the responses go?
Responses are collected in Docsiv with the form, and you can export them as a CSV file.
Start your document or form with Docsiv AI
Describe the client or the project and Docsiv AI writes a first draft of your construction change order for you to edit, share and send.






